This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.
Mid City Place

Building Name: Mid City Place
Customer: Savills
Size: 38,600 m²
Location: MidCity Place, High Holborn
Summary: JBS Technical were recently called out to Mid City Place due to a power outage to a rising busbar. The team found the 400A MCCB supplying the riser had severe heat damage. Complex LV isolation was required, safety documentation was produced and the switchboard safely isolated. Upon closer inspection and removal of warped plastic, they found the neutral link incorrectly installed and loose, causing extreme heat. The MCCB was replaced with site critical spares and supplies and was reinstated the same evening.